Uploaded image for project: 'The Virtual Brain'
  1. The Virtual Brain
  2. TVB-379 Known Bugs
  3. TVB-464

Small fixes to do after merge from branch.

    XMLWordPrintable

    Details

    • Type: Sub-task
    • Status: Closed
    • Priority: Critical
    • Resolution: Fixed
    • Affects Version/s: None
    • Fix Version/s: 0.9.6
    • Component/s: None
    • Labels:
      None

      Description

      • operationDAO usages instead of dao
        ? shorter default op-groups names
        ! Launch-group link is not working on operation's page
        ? reduce_dimension genshi function is defined in 2 places (datatype2component and reduce_dimension.html)
        ! GID_PATTERN (in workflow_service and other service) can be replaced with a new method on ABCAdapter (get_input_datatype_fields)
      • methods used from ProjectController only were defined in FlowService!!
        ! split ProjectServiceTest from branch in 2 (name the new class ProjectStructureTest).
        ! methods in FlowServiceTest in branch are no longer function, as service methods were moved into projectService. Move tests in projectServiceTest.

        Gliffy Diagrams

          Attachments

            Activity

              People

              Assignee:
              ionel.ortelecan Ionel Ortelecan
              Reporter:
              lia.domide Lia Domide
              Votes:
              0 Vote for this issue
              Watchers:
              0 Start watching this issue

                Dates

                Created:
                Updated:
                Resolved:

                  Time Tracking

                  Estimated:
                  Original Estimate - 1 day Original Estimate - 1 day
                  1d
                  Remaining:
                  Remaining Estimate - 0 minutes
                  0m
                  Logged:
                  Time Spent - 3 days
                  3d